INOVA Health System, Mt. Vernon Hospital

Mt. Vernon Hospital

Radiology Expansion and Renovations

Brinjac provided MEP, fire protection and telecommunications design and engineering services for the renovations and expansion of an existing radiology department. The project included the following: MEP and fire protection system assessment, pre and post construction air balancing plan for verification of existing system performance and to provide a consolidated system balance after completion of the final phase of construction, new MRI, Special Procedure and Multi-Purpose Procedure rooms, relocation of mammography and nuclear camera rooms, and expansion and upgrades of fire alarm and nurse call systems.

HVAC System Evaluation and Master Plan

Brinjac provided an in-depth evaluation of the facilities HVAC systems to determine system deficiencies and prioritize recommended upgrades/replacements. The evaluation included the following:

Verification of existing HVAC system zoning including supply air, exhaust air and reheat systems, condition assessment of all major HVAC equipment, review of BAS system trend data to aid in determining areas of deficient system operation, utilized testing and balancing sub-consultant to field verify air side and water side system performance, provided replacement and upgrade cost estimates for facilities engineering budgeting.

Central Plant Pumping Upgrades

Brinjac is providing engineering services for the upgrade of the existing chilled water plant's primary pumping system. The project included the following: Evaluation of pumping system deficiencies, design of pumping system modifications and upgrades, and turn-key delivery method via design-build process.